| |
Projects
A & B Rail Services is able to accommodate projects from the smallest maintenance up to contracts in excess of $20 million.2008
KELOWNA VALLEY RAILWAY Kelowna, British Columbia Production surfacing
|
SHELL Fort Saskatchewan, Alberta Plant track inspections, maintenance and repair
|
CANADIAN NATIONAL RAILWAY, ATHABASCA NORTHERN Fort McMurray, Alberta Program maintenance including 230,000 ties replaced, surfacing, tie distribution and support services
|
CANADIAN NATIONAL RAILWAY, BC NORTH Prince George, British Columbia Mainline siding extensions, 20 miles of track in 8 locations
|
CANADIAN PACIFIC RAILWAY Milk River, Alberta Mainline track revision to accomodate highway overpass
|
LOUIS DREYFUS Yorkton, Saskatchewan New grain elevator, 17000 LTF of track and 16 turnouts
|
CITY OF EDMONTON LRT Edmonton, Alberta Emergency track repair services
|
VANCOUVER PORT AUTHORITY Vancouver, British Columbia Track inspection, maintenance and repair
|
PEACE VALLEY OSB Ft St. John, British Columbia Maintain and repair crane rail as required
|
ELK VALLEY COAL Sparwood, British Columbia Inspect, report and repair lead and loop track
|
 2007
WESTERN INDUSTRIAL CONTRACTORS Prince Rupert Port Authority, British Columbia Install 2400 lined feet of crane rail
|
CANADIAN PACIFIC RAILWAY Creston, British Columbia Major tie gang and surfacing gang replacing 10,000 ties
|
CANADIAN PACIFIC RAILWAY/IPSCO Regina, Saskatchewan Construct (5) #11 turnouts, (7) #9 turnouts and approximately 9500 LTF
|
|
 2006
PLAINS MARKETING LP High Prairie, Alberta Supply and install (2) #10 turnouts, (5) #8 turnouts and 5568 LTF
|
TBM TRANSPORTATION LTD. Fort Saskatchewan, Alberta New spur development and construction
|
NSC MINERALS Fort Saskatchewan, Alberta Develop property and track including supply and install of 4 turnouts and 4500 LTD
|
CARBO CERAMICS Grande Prairie, Alberta Northern facility upgrade, modify and add new trackage
|
WESTERN CANADIAN COAL Tumbler Ridge, British Columbia Wolverine siding construction, modify mainline track and construct new sidings
|
PRINCE RUPERT PORT AUTHORITY Prince Rupert, British Columbia Supply and install crane rail, 1400 lined feet
|
B.A. BLACKTOP Prince Rupert, British Columbia Dismantle and rebuild yard tracks at Port of Prince Rupert, supply and install 25,000 track feet and 30 switches
|
|
| |